News

26 November 2021 A surprising footbridge solution

The "Ludwig-Volk-Steg" footbridge, built in 1967, connects the communities of Margetshöchheim and Veitshöchheim, near Würzburg. Two of the bridge's piers are located in the navigation channel of the Main River, which can lead to unsafe situations. With this, a new suspension bridge is under construction. With barrier-free ramps and a width of three metres, this suspension bridge allows cyclists and pedestrians to cross the Main River safely, which also allowing for safe passage for shipping traffic.

Read more

16 November 2021 Cross-border bridgework

The railway bridges over the River Oder at Küstrin, on the German-Polish border, were built in 1926. In the past, these bridges connected Berlin with East and West Prussia as part of the so-called Ostbahn. This railway is still important as a detour and alternative route for the Berlin – Warsaw route. But the old railway bridges are at the end of their technical life and out of service since the end of 2020. Therefore, they are replaced by a brand new bridge that completely spans the Oder.

Read more

07 September 2021 2 x 500-tonne crane action in Assmannshausen

Close to the old train station in picturesque Assmannshausen, Germany, experts from Wagenborg Nedlift have installed a 150-tonne element of a pedestrian tunnel. They used two 500-tonne mobile cranes to skilfully place this prefab element.

Read more

24 June 2021 Wagenborg installs new bridge components near Cologne

In the town of Frechen, near Cologne, our Wagenborg specialists had the opportunity to use their knowledge and expertise to install various bridge components. The Terex-Demag CC2200 crawler crane was chosen for the project.

Read more

12 February 2021 'Round-the-World Journey' from Wijhe to Woerden

Last week a very special transport could be seen in Woerden. The deck for the new Kwakel Bridge over the Old Rhine was transported to its destination.

Read more

08 February 2021 Unique solution for Wörsdorf rail viaduct

The Wörsdorf rail viaduct, which runs through the idyllic town of Idstein in the state of Hesse, and is situated on the Frankfurt - Eschhofen rail line, is in urgent need of renovation.Therefore, the Wörsdorf viaduct is being replaced by a new one. The new viaduct will be slid into place this coming Easter weekend. This is a large-scale operation, one in which the Wagenborg Engineering specialists were involved from a very early stage.

Read more

26 January 2021 Concrete girders installed at the Brailleweg in Groningen

'Aanpak Ring Zuid' is the project name for the large-scale conversion of Groningen's southern ring road. Groningen's rampant growth is threatening to overwhelm this road, which is the main gateway to the city. The conversion of the southern ring road will improve accessibility, traffic flow, liveability and safety. The project is scheduled for completion by 2024.

Read more

08 December 2020 Sustainable eye-catcher positioned

The Marconi Buitendijks project connects the Delfzijl city centre with the Wadden Sea. Silt and sand are used to create salt marshes off the Delfzijl coast, and the sea dike is being converted to a boulevard for walking and biking. A new, striking bridge connects the city with the boulevard.

Read more

27 November 2020 New skidding record for Wagenborg Nedlift!

Last weekend, Wagenborg Nedlift’s team of skidding specialists moved a railway viaduct of 2000(!) tons onto foundation on behalf of the new road B481n in Münster, Germany.

Read more

Please contact us!

We will be happy to assist you

Contact