News

21 November 2019 Hoisting drying tower T8 Friesland Campina

At Friesland Campina in Borculo, we are currently working intensively on the replacement of the T8 drying tower. This tower was used to dry milk powder. But how do you replace a 25-metre-high tower with a diameter of 10 metres, weighing 30 tonnes? Wagenborg Nedlift offered the ideal solution to make room for the new drying tower.

Read more

30 September 2019 New truck-mounted crane for Wagenborg Nedlift!

A brand new Volvo box truck with HIAB loading crane will be delivered in December. This combination is equipped to carry out both lifting work and laying steelplates.

Read more

21 June 2019 Gantry crane moves to Harlingen (NL)

In the next years, the Afsluitdijk reinforcement project will be executed. The dike will be heightened and at Waddensea-side be given a new top layer.

Read more

12 March 2019 Third railway bridge deck in the hook

While most people were asleep in their beds, the crew of Wagenborg Nedlift and main contractor Gebr. Reimert were very busy during a mid-February night. Scheduled for that night was the installation of the third railway bridge deck for the railway improvement project ‘Station Haren verbindt’ in the town of Haren, the Netherlands.

Read more

13 December 2018 Facilities for new baby food factory installed

In the small town of Haps in the provence of Brabant, The Netherlands, an ultramodern facility for the production of baby food is being built to meet the rapidly growing and worldwide demand for specialised baby food. The new factory is equipped with the latest technologies, which allows very energy-efficient production.

Read more

Please contact us!

We will be happy to assist you

Contact