Crawler cranes - efficient for long-term use!

What can we do for you?

  • Safety first!

  • Skilled and experienced

  • 24/7 available

Efficient for long-term use!

The use of crawler cranes is interesting for long-term projects or heavy lifting work. Wagenborg Nedlift operates crawler cranes from 180 to 750 tonnes and up. All cranes are equipped with a full configuration including jib and superlift. 

The skilled and experienced operators of Wagenborg Nedlift know the opportunities of the crawler cranes like the back of their hand, allowing them to work efficiently and safely. 

Wagenborg Nedlifts' crawler cranes are available for rental and are also used in turnkey heavy-lift projects. Explore our opportunities or contact us!

Technical information crawler cranes

180 tons crawler crane

Sennebogen 180 tons crawler crane

download file

350 tons crawler crane

Demag 350 tons crawler crane

download file

400 tons crawler crane

Liebherr 400 tons crawler crane

download file

750 tons crawler crane

Liebherr 750 tons crawler crane

download file

Wagenborg Nedlift in een notendop

Kraanverhuur uit een vloot van meer dan 100 kranen

TopconditieCreated with Sketch.

Modern materieel 

HijsmateriaalCreated with Sketch.

Groot assortiment gecertificeerd hijsmateriaal

Werkgebied van Groningen tot Benelux en Duitsland

Would you like to know more about our crawler cranes?

Would you like to know more about our crawler cranes?

Please contact our specialist!

Bert Top

Salesmanager zwaar transport

Neuigkeiten

Folgen Sie uns auf LinkedIn!

09 January 2023 Blankenfelde railway bridge on a roll

In Berlin, a large-scale renewal project of the Dresdner Bahn, one of Berlin's main rail links, is in progress. Wagenborg Nedlift's bridge team was there!

Read more

14 November 2022 Extreme precision and sophisticated logistics for Hywind Tampen

About 140 kilometers off the Norwegian coast, a unique floating wind farm is being constructed: the Hywind Tampen Floating Offshore Windfarm project. Eleven floating wind turbines, together generating 88 MW of power, will power the five offshore oil platforms at Snorre and Gullfaks.

Read more

28 October 2022 Maintenance and extension at Delamine Delfzijl

Delamine Delfzijl's production facility recently underwent a maintenance overhaul that included a substantial extension of production capacity at the same time.

Read more

Please contact us!

We will be happy to assist you

Contact