How do you replace a complete dome roof of a subtropical swimming pool at a French holiday park within four weeks? With clever lifting solutions, tight and well thought-out planning and preparation, we realised the replacement of the dome roof in record time.
Large equipment, horizontal, vertical and heavy transport are typical for the work of Wagenborg Nedlift. This seems to contradict the ever increasing focus on being sustainable. oBut is this true? But is this true? Johan Dorgelo, Commercial Director, explains.
The entire domed roof of the subtropical swimming paradise was replaced as part of a major renovation of a holiday park in Belgium. A challenging lifting conundrum for the lifting specialists from Wagenborg Nedlift!
Wagenborg transported and installed 4 enormous steel trusses as part of the construction of the Pontsteiger in Amsterdam. These trusses, built Almelo (NL), connect the Pontsteiger’s two luxurious residential towers.
SUPERLOCAL is an innovative real estate project in Kerkrade-Oost, which is located in the southern part of the Netherlands. Three high-rise buildings are transformed to approx. 125 new and modern houses in a sustainable way. The projects’ ambition is to use as much materials as possible from the high-rise buildings for the construction of the new houses
The 180-metre long striking Nelson Mandela bridge, built in 1992, was due for renovation. Entrance, staircases and elevators were renewed and installed entirely in the existing building. A unique vertical transport challenge!