News

11 August 2020 New mobile cranes for Wagenborg Nedlift!

Wagenborg Nedlift again invests in new heavy range lifting equipment. Two mobile telescopic cranes of the type LTM1450-8.1 (450 tons lifting capacity) and LTM1650-8.1 (700 tons lifting capacity) will be added to the fleet shortly.

Read more

06 August 2020 Sliding a 1700 ton colossus in Sprendlingen

In 1870 the railway between Bingen and Worms became operational. The railway underpass to the town of Sprendlingen was also built at that time.

Read more

02 July 2020 500-tonne crane in action at the UMCG in Groningen

Last Saturday, Wagenborg Nedlift's 500-tonne mobile crane, fitted with a 90-metre luffing jib, was put into action at the UMCG in Groningen. Commissioned by Medicomzes, a total of ten bridge sections were lifted at a radius of 96-metre on the roof of the hospital. Together, these sections form a bridge with a length of no less than 60 metres.

Read more

29 June 2020 Two brand new Palfinger knuckleboom cranes for Wagenborg Nedlift!

Last Friday: a festive moment for Wagenborg Nedlift and Palfinger Nederland. The keys of the first two brand new knuckleboom cranes have been handed over. Number three will follow later on. It is all about the Palfinger PK 92002-SH.

Read more

22 June 2020 Bucket dredger hoisted

On Thursday 4 June, Wagenborg Nedlift hoisted the last coal-fired bucket dredger in the Netherlands, called 'Vooruit', from the museum harbour onto the car park of the Dutch Steam Engine Museum in Medemblik (NL). A large-scale maintenance operation is scheduled for the dredger.

Read more

19 May 2020 Pressure vessel on its way to Germany

Wagenborg Nedlift recently transported a pressure vessel, weighing 138 tons, to Germany. A Wagenborg worthy challenge!

Read more

15 May 2020 Installation bridge deck EasyMax 2

The construction of mv EasyMax 2 is in progress! Last tuesday morning, Wagenborg Nedlift positioned the bridge deck at the Royal Niestern Sander shipyard.

Read more

08 May 2020 Dismantling Nordex windmills in Meedhuizen

Yesterday, we started the dismantling of four Nordex windmills in Meedhuizen (the Netherlands). We disassemble the 40 meter high mills one by one with a 400 tons mobile crane and an 80 tons rail crane.

Read more

01 May 2020 New Volvo truck equipped with HIAB crane for Wagenborg Nedlift!

Wagenborg Nedlift expanded her fleet with a brand-new Volvo FH 8 x 2 Tridem truck, equipped with a HIAB X-HiPro358E-6 crane (including gripper for steel plates).

Read more

Please contact us!

We will be happy to assist you

Contact